The project required the installation of new fire infrastructure within a busy hospitality and events venue while coordinating works alongside other contractors involved in the upgrade.
Key considerations included:
Following site assessment and consultation with project stakeholders and equipment manufacturers, FWSR Group designed and installed a dedicated fire water storage tank and diesel-driven fire pump system.
The installation included a galvanised steel fire water tank constructed in accordance with AS2419 and AS3500, paired with a diesel fire pump designed to deliver the required system pressure and flow performance.
Works were completed by our Shepparton-based projects team, ensuring safe installation and coordination with other contractors on site.
Ongoing support and compliance
Following commissioning, FWSR Group provided:
© Copyright 2025 - Firewatch Safety Results Group. Created with ❤️ by Ellis Creative.